Saturday, 13 April 2013

Filming schedule

We came to the conclusion that it would be the best to film in March. As we both had time available where we was able to dedicate ourselves to filming. We asked our friend Gabriella to star as the victim and she was willing and excited to do so. Davante would star as the detective as we thought he would be the best fit for this role. Most of the filming would take place at Marco's house, mainly in the living room. 

On March the 4th which was a Monday we filmed some of Davantes scenes. We filmed this around 5:30pm as it was just starting to get dark which gave us a great chance to use the lighting to our advantage. On March the 7th which was a Thursday we filmed some of Gabriellas scenes with Davante, we used the same location, most of the filming was done from inside but we wanted to create a sense of realism so filmed around 5:30 again.

We then edited the footage we had at school on the imovie system. We realised that we needed to film some scenes again as we wanted every scene to be perfect. It was difficult trying to get everyone together at the same time as we all had different timetables at school, also we all worked so trying to find the right time was difficult. However we decided to re-film some footage midway through March.

On March the 23rd we decided to film the villains scenes, played by Marco. We decided to film this at night time so around 8pm, we felt this was the most effective way to use low key and high key lighting. 

Most of our filming was finished by March the 27th so we was able to post our rough cut and gather together feedback

No comments:

Post a Comment